CSF Top Mount Charge-Air Cooler - Raw Finish - BMW F8X M3 / M4 / M2 Competition

Regular price $1,695.95

Black Friday price: $1,611.15 (applied in cart)

SKU: CSF8082R

Add To Wishlist

Tuners saw it on the dyno early: every consecutive pull on an S55 made less power as intake temperatures climbed. Owners felt the same fade on track when the engine could not cool off between laps.

The CSF 8082R top mount charge-air cooler replaces the factory unit with a core that is 60% larger, giving the charge air far more surface to shed heat. This version comes in a raw finish.

Keep S55 Intake Temps Down

The factory charge-air cooler cannot dissipate enough heat during prolonged performance driving. CSF's larger core greatly increases heat transfer capacity, so intake air temperatures stay lower and power stays consistent pull after pull.

Best Paired With the Heat Exchanger

CSF designed the charge-air cooler and the front mount heat exchanger (CSF 8075 / 8075V) to work together. The cooler pulls heat from the intake air, and the heat exchanger removes it from the system.

What's Included

  • (1) CSF 8082R top mount charge-air cooler, raw finish

Key Features

  • Core 60% larger than the factory unit
  • Fits the factory top mount location
  • Raw aluminum finish
  • Pairs with CSF 8075 / 8075V heat exchanger
  • CSF part number 8082R

Vehicle Fitment

CSF 8082R fits the following S55-powered BMW models:

  • BMW F80 M3 (2015-2018)
  • BMW F82 / F83 M4 including Competition, GTS and CS (2015-2020)
  • BMW F87 M2 Competition and M2 CS (2019-2021)

Does not fit the N55-powered F87 M2 (2016-2018).

Installation Notes

This is an advanced install on top of the engine. Professional installation is recommended if you have not worked on the S55 charge cooling system before.

  1. Drain the low-temperature (charge cooling) coolant circuit.
  2. Remove the intake components covering the charge-air cooler.
  3. Remove the factory charge-air cooler and install the CSF unit with new gaskets.
  4. Reconnect the coolant lines and intake components.
  5. Refill the low-temperature circuit and bleed it with the electric pump bleed procedure.